Title 24 Compliance


In Los Angeles, container homes are held to the same rigorous standards as traditional structures. They must comply with the California Energy Code (Title 24, Part 6), as well as the city’s own building codes—including accessibility and sustainability standards under Title 24, Part 11 (Green Building Code).


City of Los Angeles: Information Bulletin & Key Requirements

The City of LA Department of Building and Safety (LADBS) provides detailed guidance in Information Bulletin P/BC 2023-145 for converting cargo containers into habitable buildings. Here's what you need to know:

  • Structural Compliance:
  • All container-based structures must adhere to the Los Angeles Building Code (LABC).
  • Engineers must analyze and justify structure based on current seismic and wind design standards—container sides generally can't be counted on for lateral load resistance unless validated through advanced testing and approved as an alternate design.
  • Engineering Documentation:
  • A visual inspection report—including test results and condition assessment—is required, and must be submitted to LADBS and placed on-site for inspection.
  • Foundations & Installation:
  • Permanent foundations are mandatory.
  • You must maintain a minimum of 18 inches below plywood floor sheathing to exposed soil, unless using pressure-treated or encapsulated materials.
  • Adequate drainage and under-floor ventilation measures must be incorporated to prevent deterioration (minimum two-inch clearance, rust-inhibitive coating on steel components).
  • Utilities & Safety Systems:
  • Separate permits are required for electrical, plumbing, and mechanical installations—these must meet LADBS and Title 24 Parts 3–5 standards.
  • Grounding systems must be detailed on plans, including a bonded grounding electrode for metal structures.
  • Under-floor access for utilities is required per LABC Section 1209.1.
  • Energy & Sustainability Standards:
  • Title 24 Part 6 energy requirements (insulation, HVAC, lighting, envelope tightness) apply fully.
  • Green Building requirements under Title 24 Part 11 must also be met.


HCD-Approved Factory-Built (FBH) Container Modules

Container modules that are approved by the California Department of Housing and Community Development (HCD) as Factory-Built Housing (FBH) or Commercial Modules (CM) streamline local approval:

  • These modules are accepted by LADBS, subject still to zoning and site-specific clearances.
  • Plan review and inspection follow combined HCD and local LADBS processes, per IB P/BC 2020-112 guidelines, including a “resume of work” outlining responsibilities and required on-site steps.
  • On-site modifications to HCD-approved units over two stories are not permitted unless re-approved by HCD.


Zoning & Permit Considerations in LA

Beyond structural and energy compliance, container homes must also align with local zoning rules:

  • In Los Angeles, container structures may be permitted depending on zoning designation—but often they are only allowed as accessory structures in residential zones, or more freely in commercial/industrial zones.
  • Similar to San Diego, temporary placement (e.g., for events) may be easier than pursuing permanent residential use—permits and aesthetics (e.g., color, screening) still matter.
  • HOAs and deed restrictions may impose additional design or usage limitations—must be confirmed in early planning.


Summary: Compliance Checklist for Container Homes in LA

1. Zoning Review

Determine if your property is in a zone that allows habitable container homes, and confirm setback and neighborhood design requirements.

2. Choose Module Type

Decide if you're using standard containers or HCD-certified FBH modules. If FBH, specify in plan documents and include "resume of work."

3. Prepare Engineering Package

Include structural analysis (seismic/wind design), foundation details, drainage/ventilation, grounding, and utilities layout.

4. Energy & Green Compliance

Provide Title 24 Part 6 energy calculations and meet Part 11 rules.

5. Utilities Permits

Secure separate permits for electrical, plumbing, and mechanical systems, ensuring grounding and access compliance.

6. HCD Coordination (if applicable)

If using HCD-approved modules, coordinate plan approvals and responsibilities between HCD and LADBS.

7. Submit Application

File complete permit set with LADBS, including energy documentation, engineering reports, zoning clearance, and HCD info if applicable.

8. Inspections

Prepare for multi-stage inspections: foundation, structure, utilities, energy, and green/sustainability as required.


Final Thoughts

Building container homes in Los Angeles is feasible but demands adherence to complex energy, structural, and zoning regulations. Key takeaways:

  • Title 24 Parts 6 & 11 apply fully to habitable units.
  • LADBS Information Bulletin P/BC 2023-145 is your primary local resource.
  • Using HCD-approved FBH systems can simplify some aspects of approval—but still require careful coordination.
  • Early planning, engineering rigor, and proactive engagement with LADBS (and HCD if applicable) are essential to streamline permitting and construction.